logo
logo

Crane Installation & Feedback

Crane Installation & Feedback

15 Ton Steel Mill Crane with C-Hook, Crane Installation Feedback

15 Ton Overhead Crane fo Steel Coil Handling Project Overview

This project was for a steel plant client based in Pakistan. The main requirement was to handle heavy steel coils safely and efficiently. So, we provided a 15-ton overhead crane fitted with a C-Hook.

Crane Model and Specs

  • Model: QDX 15T-35M H6.45M
    This means the crane has a lifting capacity of 15 tons, a span of 35 meters, and a lifting height of 6.45 meters.
  • Crane Type:
    It’s a European-style double girder overhead crane. This type is known for its compact structure, high lifting height, and low wheel pressure — all of which help save space and reduce workshop load.
  • Trolley Type:
    We used an electric hoist trolley. It runs smoothly along the girders and is easy to control. This makes it great for steel coil operations where balance and positioning matter.
  • Voltage:
    The crane operates on 415V, 50Hz, 3-phase power, which matches the local power supply standard in Pakistan.

Application: Steel Coil Handling with C-Hook

The main task of this crane is to lift and move steel coils. For this, we equipped the crane with a C-Hook. This hook is specially designed to grab coils by their inner diameter. It's fast, safe, and easy to use.

Why a C-Hook?

  • Coils can be lifted without needing extra slings.
  • It reduces the risk of damaging the coil edges.
  • Perfect for high-frequency, repeated coil handling.

In short, this crane was customized to match the client’s real needs — strong, reliable, and easy to operate in a demanding steel mill environment.

 

 

Key Features of the 15T Overhead Crane

This overhead crane was built to work hard in a steel mill. Every part was chosen with care to handle the weight, heat, and dust of coil handling.

European-Style Design

This crane follows the European-style standard. That means:

  • It’s more compact but still powerful.
  • The structure is lighter, so it reduces load on the building.
  • Energy use is lower, and performance is smoother.
  • Overall, it’s more efficient and reliable — ideal for regular coil handling.

Double Girder Structure

Double girders give the crane a solid backbone. Benefits include:

  • Better stability when lifting heavy coils.
  • Higher lifting height, which helps when stacking or moving large coils.
  • Longer service life, even under tough working conditions.

Electric Hoist Trolley

The trolley moves along the girders and carries the load. Here’s what it offers:

  • Smooth operation with minimal swing.
  • Precise positioning for accurate coil placement.
  • Easy to maintain and simple to control — even for newer operators.

C-Hook for Coil Handling

This crane comes with a custom C-Hook, made for coil lifting. Why it matters:

  • Fast and secure lifting through the coil’s center hole.
  • No need for slings or manual adjustments.
  • Reduces handling time and improves safety.
  • Protects the coils from damage.

Heavy-Duty Components

Everything is built to handle steel mill conditions:

  • Motors and gearboxes are made for continuous use.
  • Steel structure resists heat, dust, and vibration.
  • Controls are sealed and protected for long-term use.

This crane wasn’t just built to work — it was built to last. If you need strong performance every day in a demanding workshop, this is the kind of crane setup that delivers.

Main girder of 15 ton steel mill crane Main girder of 15 ton steel mill crane 
Electric hoist trolley for sale Pakistan  Electric hoist trolley for sale Pakistan 
Remote controller for 15 ton overhead bridge crane Remote controller for 15 ton overhead bridge crane 

Overhead crane parts and components  Overhead crane parts and components 

 

Production & Delivery Timeline

We kept the client updated throughout the production process. Every step was planned and executed to stay on schedule. Here’s how the timeline looked:

Order Date – September 24

  • The client placed the official order.
  • Technical drawings and production plans were confirmed shortly after.

Girder Box Welding – October 21

  • The main girder box welding was completed.
  • At the same time, we started manufacturing the end carriages.
  • All fabrication was done under strict quality checks.

Paint Spraying – October 31

  • The steel structure was sent for anti-rust surface treatment and painting.
  • We used heavy-duty industrial paint, suitable for steel mill environments.
  • Paint photos were sent to the client for confirmation.

Shipment Details – November 7

  • After final inspection, we shared the total shipment weight and packing dimensions.
  • This helped the client prepare for customs and unloading.

Shipping & Payment

For this project, we made sure the shipping and payment terms were clear and easy for the client to understand.

Trade Term – CFR (Cost and Freight)

  • We agreed on CFR as the trade term, meaning we handled the costs and freight to get the crane to the client's port.
  • The client is responsible for any customs fees and unloading costs once the crane reaches the destination.

Payment Term – 100% L/C (Letter of Credit)

  • The payment was arranged through a 100% Letter of Credit (L/C).
  • This provided both parties with security, ensuring the buyer’s payment was guaranteed once the shipment was delivered.

Client Feedback

We were happy to receive positive feedback from the client. It’s always great to see the crane in action and know it’s meeting their expectations. Here’s a look at what the client shared:

Video Testimonial

  • The client sent us a video testimonial, showing the crane in action.
  • In the video, you can see how smoothly the crane operates, particularly during coil lifting.
  • The crane’s precision and speed are evident, especially with the C-Hook doing its job perfectly.
  • The client was impressed with the crane's performance and ease of use.

Video Feedback on Crane Operation

The client also shared some pictures of the crane in the workshop. These photos really highlight the quality of both the crane and its installation:

  • Crane Installation:
    The pictures show the crane being installed in the workshop, with a clear view of its structure and how it fits into the workspace. It was carefully placed to ensure maximum efficiency for the coil handling process.
  • Coil Lifting via C-Hook:
    There are several photos of the C-Hook in use, showing how easily it handles coils. The hook securely grabs the coils by their center hole, lifting them safely and quickly.
  • General Workshop Setting:
    The client also sent pictures of the overall workshop environment, where you can see the crane moving coils smoothly along the workshop. This gives a good sense of the crane’s impact in improving their workflow.

Why This Crane Was Chosen

The client chose this 15-ton overhead crane for several specific reasons, each addressing their needs in the steel mill environment.

Customized Solution for Coil Handling

  • The primary purpose of this steel mill crane was to safely and efficiently handle steel coils. After discussing the client’s specific requirements, we customized the crane with a C-Hook that securely grabs the coils through their center hole. This attachment ensures that lifting is done quickly and safely, without the need for additional equipment.
  • The C-Hook significantly reduces handling time and boosts productivity, making it the ideal solution for coil handling in a busy steel mill where fast turnaround is key.

European Design Standard

  • The 15-ton overhead crane follows European design standards, known for their superior efficiency, quality, and reliability. This means that the crane was built to last, even in the tough conditions of a steel mill.
  • The double girder design ensures the crane offers stability, high lifting height, and durability, which is crucial when repeatedly lifting heavy coils.
  • European standards also ensure the crane is energy-efficient, helping the steel mill reduce operating costs while maintaining optimal performance under heavy loads.

Trusted Delivery & Efficient Project Timeline

  • One of the client’s main reasons for choosing this steel mill crane was our ability to deliver on time. From the moment the order was placed, we ensured the crane was manufactured, tested, and shipped according to schedule.
  • We kept the client informed with regular updates throughout the production process, from welding the girder box to the completion of painting and final shipment details. This communication built trust and confidence that the project would stay on track.
  • As promised, the 15-ton overhead crane was delivered on time, ready for installation and use without any delays in the client’s operations.

Positive Feedback from the Client

  • The feedback from the client was overwhelmingly positive. In their video testimonial, they showcased the crane in operation, handling steel coils with ease and efficiency. The 15-ton overhead crane demonstrated its ability to meet the specific needs of their steel mill.
  • The pictures shared by the client illustrated the crane being installed and operating smoothly. The C-Hook attachment was clearly shown in action, lifting coils safely and quickly. These images validated the crane’s performance and highlighted its effectiveness in the steel mill environment.

Conclusion & Takeaway

This project involving the 15-ton overhead crane highlights our expertise in providing customized, high-performance solutions for steel mills and workshops.

Key Takeaways:

  • The crane was specifically engineered to meet the unique requirements of coil handling in a steel mill.
  • With regular updates and efficient project management, the crane was delivered on time and ready for operation.
  • The positive feedback from the client confirms the steel mill crane’s reliability, performance, and ability to meet operational needs.

At Yuantai Crane, we specialize in delivering tailored solutions that enhance productivity in demanding environments like steel mills.

Interested in a Similar Solution?If you're looking for a customized steel mill crane or 15-ton overhead crane for your steel plant, contact us today to discuss how we can provide a solution tailored to your needs.



Recommended Products

European-Style Explosion-Proof Double Girder Cranes with Hoist

European-Style Explosion-Proof Double Girder Cranes with Hoist


Reliable, safe, and efficient cranes for hazardous environments, featuring explosion-proof hoist trolley and durable double girder design.

Explosion-Proof Underrunning Overhead Cranes 1Ton to 10 Ton

Explosion-Proof Underrunning Overhead Cranes 1Ton to 10 Ton


Explosion-Proof Underrunning Overhead Cranes (1 to 10 Tons): Ensuring Safe, Efficient Lifting in Hazardous Environments with Custom Solutions

Straddle Carrier for Container Handling

Straddle Carrier for Container Handling


Efficient, flexible container straddle carrier with high lifting capacity, maneuverability, and safety for ports, terminals, and logistics operations.

Get a quote

Get In Touch Now

Need Latest Crane Price? Please leave us the required Crane's Capacity, Lifting Height, Span, Travelling Length & Voltage for Quick Quotation.